Decommissioning refers to a collection of procedures used to clean up, disassemble, and remove a power plant’s buildings and parts once it has finished producing electricity.

The property will go through decommissioning, remediation, and rehabilitation after the plant closes. Despite the fact that it is not always feasible, it is beneficial to be aware of site reuse options early on in the cleaning process in order to guide cleanup choices and gauge the proper amount of effort required at each step of the assessment, cleanup, and redevelopment process.

It will be easier to generate realistic schedules and cost estimates if you are aware of the variety of reuse choices available and the requirements connected with each. Plans for redevelopment should also take into account the time and expenses related to obtaining licences, getting permits, plans, and funds approved, as well as the engagement of the public.

Environmental permits often outline what should be done before, during, and following closure. To guarantee that the decommissioning, remediation and redevelopment processes comply with permit requirements, plant owners must work with public utility and environmental regulators.

What steps are typically taken during the decommissioning process?

The decommissioning starts when the plant closes and is completed after all operations have stopped. The process of decommissioning a coal-fired power station is not always apparent and may overlap with remediation and rehabilitation, in contrast to nuclear plant decommissioning, which the federal government tightly oversees.

After deciding to shut down the plant, the owner should create a decommissioning management strategy that meets his or her needs as a business. Many different management approaches may be taken into account, from the owner keeping total control to the use of a third party to supervise the operation. Early on in the process, the owner may also sell the property to a developer or municipality.

Also Read: What is Deep Discharge?

The electrical producing units are turned off and all operating licences are revoked during decommissioning. Unused coal and dangerous substances related to both the generation process and the buildings/structures (such as polychlorinated biphenyls [PCBs], lead, or process chemicals), are removed.

After being cleaned, electrical producing equipment might be removed and used elsewhere or sold for scrap. Buildings and structures may need to be partially demolished to make room for cleaning or equipment removal. Power stations with on-site solid waste landfills or coal ash ponds are required to close these sites in accordance with federal and state permit regulations.

Share.
mm

Elliot is a passionate environmentalist and blogger who has dedicated his life to spreading awareness about conservation, green energy, and renewable energy. With a background in environmental science, he has a deep understanding of the issues facing our planet and is committed to educating others on how they can make a difference.